NZDF

New ship handed over to Navy

2007 - The new CANTERBURY berthed in Melbourne

1 June 2007

Media Advisory

A significant step towards bringing home the first of seven ships being built for the New Zealand Navy under Project Protector occurred in Melbourne, Australia, yesterday (Thursday 31 May).  A special ceremony attended by representatives of the Navy, Tenix and the Ministry of Defence was held inside the hanger of the massive multi-role vessel CANTERBURY where she was formally handed over to the Navy. 

New Zealand Secretary of Defence, Mr John McKinnon, mentioned how the CANTERBURY is a great step forward in terms of a New Zealand Defence Force capability and said it will be an exciting future for both the Navy and New Zealand.  He also took the opportunity to thank Tenix for their hard work to date. 

Mr McKinnon also thanked his Ministry of Defence Team, including the Navy personnel on the project, acknowledging their significant contribution to the project thus far.

Ashburton-born Commanding Officer of CANTERBURY, Commander Tony Millar, said

“Today was a day of firsts; it was the first time that New Zealand has taken delivery of a ship with such capability; it was the first time her new crew had moved onboard and it was the first official duty onboard the CANTERBURY for our sailors.” 

“We now have full possession of this magnificent new ship ... and it feels great!”  he concluded.

Yesterday’s formal handover was the first step in bringing home the CANTERBURY.  She is to be formally commissioned into service on June 12 in Melbourne and will arrive in Lyttelton for her homecoming on June 28.  She will then visit Timaru between 4 and 6 July before arriving at the Devonport Naval Base, the home of the Navy, in late July.

Photo caption: CANTERBURY berthed in Melbourne

ENDS

For further information, please contact Lieutenant Commander Barbara Cassin, Navy Public Relations Manager, on cell 021 244 0638 or Kirsty Clokie, Assistant Public Relations Manager Navy on 021 745 288.

http://www.navy.mil.nz/visit-the-fleet/project-protector/default.htm

Background
The Multi-Role Vessel CANTERBURY is the first of seven new ships built for the Royal New Zealand Navy under Project Protector.  She is affiliated to the Canterbury Region.  She was built at the Merwede Shipyard in the Netherlands, under contract to Tenix. CANTERBURY’s design is based on a commercial RO-RO ship, Ben-My-Chree in operation in the Irish Sea. 
CANTERBURY will have diesel-electric propulsion and a maximum speed of just over 19 knots.  She will provide a sealift capability for the transport and deployment of equipment, vehicles and personnel, and capable of transferring cargo and personnel ashore in benign conditions (up to sea state 3) when port facilities are not available.  CANTERBURY has two 59 tonne Landing Craft Medium (LCM) capable of carrying 50 tonnes at 9 knots with a range of 250 nm. 

Particulars of CANTERBURY
Displacement:  9000 tonnes
Length overall: 131 metres
Beam:             23.4 metres
Speed:            19 knots

Complement:  Core ship's company:  53
Flight personnel:         10 
Government agencies:  4
Army ship's staff:         7 
Trainees:                    35 
Troops:                      250 
Total:                         360

Propulsion:      Diesel engines
Flight deck:      Space for two helicopters

Armament: 25mm and two .50 calibre machine guns

Helicopter capability
The NH90 Helicopter has been selected as the NZDF’s preferred medium Utility Helicopter to replace RNZAF’S Iroquois.  Up to four NH90’s can be carried onboard the MRV for deployment ashore in support of Army operations and disaster relief activities.  The MRV is also capable of operating the SH-2G Seasprite and the helicopter deck is able to handle a Chinook-size helicopter.

This page was last reviewed on 21 January 2011, and is current.