NZDF


  Return to list  Next Image

NZ engineers busy at work on the Al Tannumah Bridge, Basra. The bridge is already showing signs of stress as a result of a 100% increase in traffic.

NZ engineers 

NZ engineers busy at work on the Al Tannumah Bridge, Basra. The bridge is already showing signs of stress as a result of a 100% increase in traffic.

 


This page was last reviewed on 13 December 2006, and is current.